Mitigate risk and schedule in road closures which required shutting down the entire street to allow for complex crane lift with a long reach to the rooftop structure.


Greenstar sourced a suitable air-cooled chiller that was a suitable capacity, weight loading, frame size along with reduced current draw to enable a fast installation with minimum downtime
Once successfully landed new pipework, controls and electrics were installed connected and commissioned over the remainder of the weekend. With the Machine powered up and pre commissioning completed the plant was operational on the Monday morning.