Condenser Water Pipework Replacement

The Brief

Replace failing condenser water pipework from roof top mounted cooling towers to the Chiller plant located in the middle of the building whilst ensuring the plant downtime is limited to after hours.

Condenser Water Pipework Replacement
Condenser Water Pipework Replacement

Our solution

A new condenser water pipework riser was decided as the only feasible solution as the current riser was required to remain operational. A new riser location was determined and engineering conducted to ensure feasibility, All new pipework, bracketing and associated valving was installed and all works completed and pressure tested before the final after hours cut ins which were completed over a scheduled long weekend to allow for the additional time required to drain, connect, fill and recommission the system which required a total drain down to facilitate the works.

The results

All works were completed in advance of the required time frame with the successful cut over and recommission taking place to ensure a successful outcome for all stakeholders.

Condenser Water Pipework Replacement
Greenstar

Greenstar